Genuine Diamond Aircraft parts, supplied by EFM. Price and availability on request.
Bolt, Cylinder Head, hexagon socket
Thielert / TAE
71-50 Engine Electrical Harness
Nut
Diamond Aircraft
71-50 Engine Electrical Harness
Bonding Cable
Thielert / TAE
71-50 Engine Electrical Harness
Bonding Cable
Thielert / TAE
71-50 Engine Electrical Harness
Bonding Cable
Thielert / TAE
71-50 Engine Electrical Harness
Harness, LH
Thielert / TAE
71-60 Air Intakes
Harness, RH
Thielert / TAE
71-60 Air Intakes
Edge Clip
71-60 Air Intakes
Rubber Protection Strip
71-00 Power Plant
Silicone Profile
71-10 Engine Cowlings Access Panels - Old Version 1
Fuel Hose, Gates 4219-3681-6.3mm
Thielert / TAE
71-70 Engine Drains - TAE125-02-99
Hinge
Thielert / TAE
71-10 Engine Cowlings - TAE125-02-99
Shrink Hose
Thielert / TAE
61-20 Propeller Control - TAE125-02-99
Oil Hose
71-00 Power Plant
Hydraulic Hose
61-20 Propeller Control 2
Oil Hose
71-00 Power Plant
Hose, Ø11,5 x 670mm
71-70 Engine Drains - DA 40 F
Bolt, Hexagon Head
AN standard part
61-20 Propeller Control 2
Screw
AN standard part
71-00 Power Plant
Bolt, Hexagon Head
AN standard part
71-50 Electrical Harness
Bolt, Hexagon Head
AN standard part
71-50 Electrical Harness
Nipple
AN standard part
77-10 Manifold Pressure
Fitting
AN standard part
61-20 Propeller Control 2
Nut, Union 1/4"
AN standard part
71-70 Engine Drains 3
Collar DM5.2
AN standard part
71-70 Engine Drains 3
Hose Ø6,3 x 1200mm
71-70 Engine Drains 4
Hose Ø5 x 300
71-70 Engine Drains 4
Clamp, loop, cushioned
71-00 Power Plant
Clamp, Loop, Cushioned
21-40 Heating 1 - E4-C - Additional Alternator
Clamp, Loop, Cushioned
71-70 Engine Drains - E4-C
Clamp
Thielert / TAE
71-60 Air Intake Control - TAE125-02-99 - Old Version
Bush
71-00 Power Plant
Bushing
71-70 Engine Drains
Bushing
71-20 Engine Mounting Frame Installation
Bushing
71-60 Air Intakes
Spacer
71-20 Engine Mounting Frame Installation
Spacer
71-20 Engine Mounting Frame Installation
Bushing
72-00 Engine
Bushing, Nylon
Thielert / TAE
71-60 Air Intakes - TAE125-02-99
Bonding Wire
71-60 Air Intakes 2 - E4-C
Bonding Wire
21-60 Temperature Control
Bonding Wire
71-60 Air Intakes 1 - E4-C
Diamond Standard Bonding Wire
71-60 Air Intakes 2
Bonding Wire Assembly
27-10 Aileron Controls in the Wing
Bonding Wire Assembly
27-50 Flap Drive Motor Installation
Self-Locking Nut
MT-Propeller
61-20 Propeller Control
Washer
71-00 Power Plant
Washer
MT-Propeller
61-20 Propeller Control
Washer
71-00 Power Plant
Cherry Blind Rivet, Countersung 100°
71-60 Air Intakes 2